Ornithology Technical Report for the proposed Dogger Bank Creyke Beck Offshore Wind Farm projects

Report

Title: Ornithology Technical Report for the proposed Dogger Bank Creyke Beck Offshore Wind Farm projects
Publication Date:
March 01, 2013
Document Number: 630
Pages: 5
Receptor:

Document Access

Website: External Link
Attachment: Access File
(161 KB)

Citation

Burton, N.; Thaxter, C.; Cook, A.; Austin, G.; Humphreys, E.; Johnston, A.; Morrison, C.; Wright, L. (2013). Ornithology Technical Report for the proposed Dogger Bank Creyke Beck Offshore Wind Farm projects. Report by British Trust for Ornithology (BTO). pp 5.
Abstract: 

This note provides errata for two parts of Section 4 (the Environmental Impact Assessment Methodology) of the Ornithology Technical Report for the Creyke Beck A and B projects. Amendments are provided below for:
i. Table 4.21 Summary of worst case scenarios used in the impact assessment;
ii. Paragraphs 4.6.11 to 4.6.15 of the Cumulative Impact Assessment Methodology.