Abstract
Kiyikoy Wind Power Plant (WPP) is located in Vize district of Kirklareli province in the northwestern part of Turkey. Alenka Enerji Üretim ve Yatırım A.Ş., a special purpose vehicle established for the development of the Project by the previous owner, has been operating the first phase of the Kiyikoy WPP with an installed capacity of 28 MWm/27 MWe (14 turbines, 2 MWm each) since August 2014.
On 1 December 2017, Borusan EnBW Enerji Yatırımları ve Üretim A.Ş. and Borusan Danışmanlık Ortak Hizmetleri A.Ş. (jointly referred to as BEE) acquired the Kiyikoy WPP from its previous owner and became the sole owner of the Project. BEE, through the Project Company, considers increasing the total installed capacity of the Project to 100 MWm/99 MWe as part of the Kiyikoy WPP Capacity Extension Project through construction and operation of 20 new turbines (3.6 MW, Vestas V136 model).
BEE is considering international and national finance for the implementation of the Project. In line with the Environmental and Social (E&S) Policy and related Performance Requirements (2014) of the European Bank for Reconstruction and Development (EBRD), an Environmental and Social Impact Assessment (ESIA) Disclosure Package has been disclosed to the public at the