Abstract
This Project Environmental Monitoring Programme (PEMP) for the Beatrice Offshore Transmission Assets has been prepared to address specific post-construction and operation and maintenance (O&M) requirements of Marine Licence Condition 3.2.1.1 for the Beatrice Offshore Transmission Works (OfTW). The overall aim of this PEMP is to outline and define the approach taken to environmental monitoring of potential environmental impacts associated with post-construction and O&M and is designed to provide guidance to those involved in the management of the Offshore Transmission Assets.
This document is related to the Beatrice Offshore Wind Farm Project Site.