Thornton Bank Offshore Wind Farm Annual Report 2019

Abstract

The 2019 Annual Report for the Thornton Bank Offshore Wind Farm documents a significant organizational transition following the insolvency of wind turbine manufacturer Senvion. The report highlights operational continuity, maintenance activities, and safety performance.

Key activities in 2019 included:

  • Major component replacements on multiple turbines
  • Conclusion of aquaculture test project
  • Continued Safety Culture and Health Improvement Campaign
  • Organizational restructuring

Notable safety observations:

  • 40 companies performed 82,938 man-hours
  • Two Lost Time Incidents reported
  • One minor hydraulic oil leak incident
This document is related to the C-Power/Thornton Bank Project Site.