Skip to main content

LONDON ARRAY WINDFARM: EXPORT CABLE ROUTE POST-CONSTRUCTION SURVEY

Abstract

This document outlines the Operations of the Wessex Explorer and the procedures that were performed during mobilisation and verification of the hydrographic survey equipment, in preparation for DONG London array Export cable post construction survey.

Mobilisation and Operations Report

Interpretive Report

This document is related to the London Array Project Site.