Skip to main content

Joint Statutory Nature Conservation Bodies Position Statement: ORJIP Project 4, Stage 1 of Phase 2

Abstract

This note is intended to clarify the current SNCB position in relation to Acoustic Deterrent Devices (ADD) use for piling mitigation operations and is primarily based on the evidence reviewed within the Phase 2 report (Sparling et al., 2015) and the Gordon et al., (2015) report