Abstract
The paper describes the experiences from Middelgrunden Offshore Wind Farm. Middelgrunden was established on a natural reef with 3 to 8 metres water depth, 3.5km outside Copenhagen harbour, in the autumn of 2000. The offshore wind farm consists of twenty 2 MW turbines from Bonus Energy, now Siemens Windpower, and is owned 50% by Energi E2 and 50% by The Middelgrunden Wind Turbine Cooperative with 8,553 members. It is the largest wind farm in the world based on cooperative ownership.
The paper also describes the model for public involvement, based on experience from offshore projects in Denmark. It is concluded that although active public involvement is a time and resource requiring challenge, it is to be recommended as it may lead to mitigation of general protests, blocking or delaying projects, and increase future confidence, acceptance and support in relation to the coming offshore wind farms in Europe.