Abstract
Environmental monitoring surveys were carried out in and around the Thanet Offshore Wind Farm site during the pre, during and post-construction stages of the development. This has been a requirement of the licenses issued under the Marine and Coastal Access Act (Marine License); formally the Food and Environmental Protection Act (FEPA) license. This document represents a summary of the post-construction monitoring that has been undertaken since the wind farm became operational. The collection dates of this report were from November 2012-October 2013.