Abstract
This document presents a summary of the two-year Seabird Monitoring Study at the Neart na Gaoithe (NnG) wind farm, planned to commence in March 2026.
This document presents a summary of the two-year Seabird Monitoring Study at the Neart na Gaoithe (NnG) wind farm, planned to commence in March 2026.