London Array Offshore Wind Farm Project - Pre-Construction Marine Environmental Monitoring Plan

Abstract

This document is the pre-construction Environmental Monitoring Plan for Phase 1 of the London Array project. An Environmental Plan for subsequent phases of the wind farm development will be produced and submitted accordingly, and following a recommendation from the Ornithological Review Panel that these phases can go ahead. It is based on the requirements of the FEPA License (32945/09/0)

 

The document is intended to provide details on:

• The range of environmental monitoring proposed for the project;

• The specifications of the proposed monitoring;

• The provisional programme for all proposed monitoring; and

• The proposed approach to reporting and presenting the findings of these surveys. 

This document is related to the London Array Project Site.