Abstract
Life cycle greenhouse gas (GHG) accounting is increasingly required to substantiate the climate value of wind power beyond “zero-emission” operation, especially under China’s dual-carbon targets. Robust estimation of life cycle GHG emission intensity and the identification of actionable mitigation levers are therefore important for credible transition planning. In this study, a process-based life cycle assessment (LCA) was conducted for a representative 100 MW onshore wind farm in Gaoyou, Jiangsu Province, China, following ISO 14040/14044. To enhance engineering relevance, the construction and installation phase was modeled in a refined manner by decomposing it into road, wind-turbine, booster-station, and transmission-line engineering and further into unit processes. The results show that the overall life cycle GHG emission intensity of the studied wind farm is 24.6 g CO2-eq/kWh. Scenario analysis further indicates that reducing curtailment and improving end-of-life recycling are effective pathways to lower emission intensity, while the net advantage of hybrid versus steel towers depends on recycling performance when end-of-life credits are included. The study also summarizes practical implications for low-carbon equipment/material procurement and green supply-chain governance, low-carbon construction and logistics, coordinated “source–grid–load–storage” planning to curb curtailment, and more standardized and comparable life cycle carbon accounting for wind projects in China.