Burbo Bank Extension Offshore Wind Farm Volume 2: ES Biological Environment

Report

Title: Burbo Bank Extension Offshore Wind Farm Volume 2: ES Biological Environment
Authors: DONG Energy
Publication Date:
March 01, 2013
Document Number: 5.1.2
Pages: 610
Stressor:
Receptor:

Document Access

Attachment: Access File
(37 MB)

Citation

DONG Energy (2013). Burbo Bank Extension Offshore Wind Farm Volume 2: ES Biological Environment. Report by ABP Marine Environmental Research Ltd (ABPmer), Dong Energy, Natural Power, and Subacoustech Ltd. pp 610.
Abstract: 

The Project for which development consent is sought consists of an extension westwards of the existing Burbo Bsnk offshore wind farm. The proposed offshore Project site covers an area of 40 km² which lies approximately 7 km north off the North Wirral coast. The maximum capacity of the wind farm will be up to 258 MW, consisting of offshore wind turbines and foundations, an offshore substation, buried inter-array and export cable(s), buried onshore cable(s) from the cable landfall in North Wales between Rhyl and Prestatyn to a new onshore substation next to the Bodelwyddan substation near St Asaph in Denbighshire where the cable will connect with the National Grid. Chapters included in document: Fish and Shellfish Ecology, Marine Mammals, Ornithology, and Commercial Fisheries.

Find Tethys on InstagramFind Tethys on FacebookFind Tethys on Twitter
 
CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.