Skip to main content

Bat Resources Reports for Beech Ridge Wind Energy Project

Abstract

This report contains the Bat Resources Reports for Beech Ridge Wind Energy Project, from Appendix F of the Beech Ridge Energy Wind Project Habitat Conservation Plan Final Environmental Impact Statement.  Reports included are:

  • Report F-1. Mist Net Surveys at the Proposed Beech Ridge Wind Farm, Greenbrier County, West Virginia (BHE 2005)
  • Report F-2. Chiropteran Risk Assessment, Proposed Beech Ridge Wind Energy Generation Facility, Greenbrier and Nicholas Counties, West Virginia (BHE 2006)
  • Report F-3. Bat Mist Netting and Acoustic Surveys, Beech Ridge Wind Energy Project, Greenbrier and Nicholas Counties, West Virginia (Young and Gruver 2011)
  • Report F-4. 2012 Post-Construction Carcass Monitoring Study for the Beech Ridge Wind Farm, Greenbrier County, West Virginia, Final Report, April 1 – October 28, 2012 (Tidhar et al. 2013)
  • Report F-5. Revision of Take Estimate for Beech Ridge Energy Permit (USFWS 2013b)