Skip to main content

Palochak, A.

Marine and Wind Energy Environmental Documents

Tethys is a knowledge hub that contains documents on the environmental effects of wind and marine energy. The table below contains all of the documents in the Tethys Knowledge Base associated with Palochak, A..

Total: 2

Title Author Date Content Type Technology Stressor Receptor
Year 1 Post-construction Avian and Bat Monitoring Report: Biglow Canyon Wind Farm Phase II Sherman County, Oregon Enk, T., Bay, K., Sonnenberg, M. Report Wind Energy, Land-Based Wind Collision Bats, Birds
Portland General Electric Biglow Canyon Wind Farm Phase I Post-Construction Avian and Bat Monitoring First Annual Report Sherman County, Oregon: January, 2008 - December, 2008 Jeffrey, J., Bay, K., Erickson, W. Report Wind Energy, Land-Based Wind Birds, Bats

Displaying 1 - 2 of 2 results