Abstract
1 Introduction
1.1 Purpose of this Document
1.1.1.1 This document represents the initial decommissioning plan for the programme of works for Hornsea Three and is being submitted in accordance with the Energy Act 2004 and adhering to the updated requirements issued in March 2019 (DESNZ, 2019).
1.1.1.2 This Decommissioning Plan is informed and supported by the Environmental Impact Assessment (EIA) for Hornsea Three that was submitted to BEIS (as it then was) in May 2018. The Decommissioning Programme is based on the technology available at the time of writing and will be reviewed and updated based on further evidence and technology available nearer to the time of decommissioning.