Abstract
Interim report for the period 1 January - 30 June, 2019. Status report for Jaffa Port, Gibraltar, and Manzanillo projects.
This document is related to the Eco Wave Power Wave Energy Power Station Jaffa Project Site.
Interim report for the period 1 January - 30 June, 2019. Status report for Jaffa Port, Gibraltar, and Manzanillo projects.