TY - RPRT TI - Rampion Windfarm: Simultaneous piling assessment AU - HR Wallingford Ltd AB - In order to support E.ON's request for the modification of seasonal restrictions on piling at the Rampion Offshore windfarm, HR Wallingford was commissioned to examine underwater noise propogation arising from a reduction in the proposed hammer energy.Following a review of previous studies by the Marine Management Organisation (MMO), E.ON commissioned HR Wallingford to re-analyse the previous model results in terms of a different metric for marine mammals, namely the M-weighted cumulative SEL for fleeing individuals so as to be more consistent with previous EIA studies. The modelling has also re-investigated the behavioural sound threshold for herring using a different metric and threshold. DA - 2016/07// PY - 2016 SP - 25 PB - HR Wallingford Ltd SN - DDM7600-RT005-R01-00 LA - English KW - Wind Energy KW - Fixed Offshore Wind KW - Noise KW - Fish KW - Marine Mammals ER -