TY - RPRT TI - Hornsea Three Environmental Monitoring Plan for Impacts Associated with Cable Protection AU - Royal Haskoning DHV AB - A Development Consent Order (DCO) was awarded to Hornsea Three on 31st December 2020.Part 2 of Schedule 14 of the Hornsea Three DCO (the DCO) outlines the required benthic compensation measures which must accord with the Sandbanks Compensation Strategy1 and be drafted into separate Sandbank Implementation Plans (SBIPs) for the North Norfolk Coast (WNNC) Special Area of Conservation (SAC) and North Norfolk Sandbanks and Saturn Reef (NNSSR) SAC and submitted to the Secretary of State for approval. DA - 2021/01// PY - 2021 SP - 16 PB - Royal Haskoning SN - 07126576_A UR - https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/EN010080/EN010080-003629-Hornsea%20Three%20SBIP%20Appendix%20Two%20Environmental%20Monitoring%20Plan%20(07126576_A).pdf LA - English KW - Wind Energy KW - Fixed Offshore Wind KW - Habitat Change KW - Physical Environment ER -