Post-Construction Bird and Bat Mortality Study Cedar Ridge Wind Farm Fond Du Lac County, Wisconsin

Report

Title: Post-Construction Bird and Bat Mortality Study Cedar Ridge Wind Farm Fond Du Lac County, Wisconsin
Publication Date:
February 01, 2011
Document Number: 6680-CE-171
Pages: 147
Sponsoring Organization:
Stressor:
Receptor:

Document Access

Website: External Link
Attachment: Access File
(5 MB)

Citation

BHE Environmental, Inc. (2011). Post-Construction Bird and Bat Mortality Study Cedar Ridge Wind Farm Fond Du Lac County, Wisconsin. Report by BHE Environmental, Inc. pp 147.
Abstract: 

BHE Environmental, Inc. was contracted by Wisconsin Power and Light Company (WPL) to conduct two years of post-construction bird and bat mortality surveys at its Cedar Ridge Wind Farm in Fond du Lac County, Wisconsin. Twenty of the 41 turbines were selected to be surveyed from March 15 to May 31, 2009, July 15 to November 15, 2009, March 15 to May 31, 2010, and July 15 to October 15, 2010. This report summarizes data collected during the 2009 and 2010 survey periods.