Annex IV distributes metadata forms (questionnaires) to solicit information from developers involved in environmental monitoring around marine renewable energy project sites around the world. This page provides project descriptions, baseline assessment, post-installation monitoring, and links to available data and reports. Content is updated on an annual basis.

Costa Head Wave Farm

This information may be outdated, so please use caution when referencing these metadata.
If you are associated with this project and capable of providing updates, please send us an email.

Project Site OES-Environmental

Title: Costa Head Wave Farm
Country:
Technology Type:
Info Updated:
March 03, 2016
Visualisation of an AWS-III farm at sea on a calm day
Project Status: 
Device never deployed
Technology: 
AWS-III
Project Scale: 
Commercial array
Installed Capacity: 
200 MW (Planned)
Description: 

Costa Head Wave Farm Limited (CHWFL) is a partnership between Alstom and SSE Renewables UK Limited (SSER). An Agreement for Lease (AfL) over an area of 24 km2 roughly 5 km to the north of Mainland Orkney has been granted to CHWFL, giving the company exclusive rights to the development of the seabed in this area. The proposed array will be installed in two distinct phases, with the first phase seeing the construction and installation of 4 wave energy converters (WECs) producing a combined capacity of 10 MW. Phase 2 will involve the installation of the remaining devices, upgrading the array to an anticipated installed capacity of 200MW [1].

 

AWS-III wave energy converters will be used for this project. Initial trials of these devices is underway, however the technology is still under development and the first full scale prototype is due for deployment in 2014. The AWS-III is a self-reacting, multi-cell, floating ring shaped WEC. Wave action is converted into pneumatic power via reinforced flexible diaphragms, which in turn power a turbine-generator set that produces electricity. The lack of any exposed moving parts may contribute to extending the operational life and reliability of the AWS-III [1].

 

The devices will be attached to the seabed via moorings and each device will be connected to the next with interarray cables. An export cable will transfer generated electricity from the array to shore. A number of export cable routes exist, however further environmental information is required before a final route is determined. Similarly the exact location for the landfall station is not yet known, and will be identified based on environmental, technical and economic criteria [1].

Moorings:

The design of the mooring system to be used has not yet been finalised. Two types of mooring system are currently being considered. The multi-tether “Admiralty Type” mooring system uses drag embedment anchors and combines semi-taught tethers with chain catenaries. The arrangement is comprised of:

  • Four vertical synthetic tethers attached to the device which are connected to and tensioned by a lump mass (provided by four clump weights or one steel/concrete ring);
  • Four sets of twin chain lines used to connect each anchor point to the vertical  tethers; and
  • Four drag embedment anchors [1].

Taut synthetic moorings with vertical load anchors (VLA) allow for a higher density of device layout and rely on the development of specific synthetic lines. The arrangement is comprised of:

  • Four synthetic lines; and,
  • Four VLAs or piles [1].

The number of anchors and lines could increase to ensure sufficient redundancy in the system. This is unlikely to exceed eight per system. The type of anchor to be used is also uncertain, the candidates are:

  • Drag embedment anchors;
  • Piles;
  • Vertical Load Anchors (VLA); and
  • Gravity based anchors.

Each of the above has specific requirements and performance according to seabed condition [1].

 

Export Cables:

The AWS-III converters installed in both Phase 1 and Phase 2 will be inter-connected within the array. Each device will export power via its own 11 to 33kV inter-array cable. A number of factors including seabed condition, mooring arrangement and anchoring solution will influence the number, length, spacing and configuration of inter-array cables [1].

 

For Phase 1 the inter-array cabling is likely to comprise of one of two configurations:

  • Individual umbilical cables per device; or
  • A single umbilical used to connect multiple/all the converters in a daisy chain type arrangement.

It is anticipated that the inter-array cables will connect to a single export cable via a connector or a subsea terminal box in Phase 1.  Phase 2 will most likely require an offshore substation within the AfL to bring multiple lower voltage inter-array cables together and export power to shore at a higher voltage. In Phase 2 multiple export cables may be required, but will use the same route along the seabed. The offshore substation is most likely to be a fixed seabed mounted platform, however a floating structure has not been ruled out [1].

 

Onshore infrastructure:

There are a number of potential landfall sites and grid connection routes that have been identified for this project. Although additional information is required, it is likely that CHWEFL will aim to find a grid connection point at the export cable landfall site [1].

Location: 

Costa Head, North of Mainland Orkney 

Licensing Information: 

No Licence or consent applications have been submitted for the Costa Wave Farm to date.  

Key Environmental Issues: 

An Environmental Impact Assessment has not been undertaken to date for this proposed development.  

Costa Head Wave Farm is located in United Kingdom.

Baseline Assessment: Costa Head Wave Farm

General Description:

The baseline provided in the scoping document was mostly desk based and did not carry out any site specific surveys, however it did not there were a number of data gaps. It proposed the surveys listed in the following table to better inform the baseline of the EIA.

ReceptorStudy Description Design and Methods Results Status
  • Physical Environment

Metocean and Geophysical

A full wave energy resource measurement programme is underway using two Waverider Buoys and ADCPs at the site, these were deployed in March 2011. The buoys were removed in March 2013.

N/A

Completed
  • Physical Environment

Metocean and Geophysical

Geophysical survey is to provide detailed map of the seabed in the AfL and cable route corridor.

N/A

Planned
  • Intertidal Ecology

Phase 1 survey

An intertidal survey to categorise the habitats and establish what species are present in the landfall area.

N/A

Planned
  • Benthos

Benthic ecology

Video survey with still images taken of the seabed.  Conducted across the Agreement for Lease area and the cable route corridor.  Also to include grab sampling to analyse infauna and complement geophysical survey.

N/A

Planned
  • Birds

Distribution and behaviour survey

Site specific marine wildlife surveys to establish use of the area and behaviours of marine mammal and reptile species. Consideration will be given as to whether underwater noise baseline measurements will be required.

N/A

Planned
  • Basking Sharks
  • Marine Mammals

Distribution and behaviour survey

Site specific marine wildlife surveys to establish use of the area and behaviours of marine mammal and reptile species. Consideration will be given as to whether underwater noise baseline measurements will be required.

N/A

Planned
Find Tethys on InstagramFind Tethys on FacebookFind Tethys on Twitter
 
CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.